Miami-Dade County Code Compliance

North Miami,
hand us the letter.

Recertification here is filed with the City's own Building Department, on the county's current report forms. We handle the inspection, the report and that filing end to end, through to your proof of recertification.

Licensed Florida Professional EngineersLevel II ThermographersFully insuredHablamos Español
North Miami at a glance

What recertification means for your building

25 or 30
Years to your first cycle

Condo and co-op buildings three stories or taller within three miles of the coast start at 25 years. All other buildings start at 30. Then every 10 years.

2 yrs
First courtesy notice

Owners receive courtesy notices two years and one year ahead, then the final notice.

90 days
To file after the notice

Reports are due within 90 days of the final notice.

4
Report forms in the package

Structural, electrical, parking lot guardrails and parking lot illumination, on the county's 2025 forms.

You do not have to wait for the notice. The paperwork can be submitted up to two years early, and recertifying early does not shorten your cycle.

Find out where your building stands →

Sources: City of North Miami Building Department, Milestone Recertification 30/10 year; Miami-Dade County recertification program (Code Sec. 8-11).

Who we are

Local experience, not a learning curve on your dime

ESi was founded in 2014 by Oscar Sebelen, P.E., a licensed Electrical Professional Engineer in Florida since 2005, with more than 25 years of engineering experience at the helm. We know how buildings are designed and built, where problems tend to hide and what each building department in Miami-Dade and Broward expects to see.

We discuss the findings with you first

A draft report and a conversation about any repairs, before anything is filed.

No conflict of interest

We inspect. We do not design and we do not repair, so we have no incentive to report deficiencies that are not there.

We handle the permitting too

The submittal and the correspondence with the City of North Miami Building Department, at no additional cost.

ESi engineer on a job site
What your North Miami recertification includes

One team manages all the required inspections

North Miami follows the Miami-Dade scope. We keep every discipline with one team, so the scope, the schedule and the accountability stay in one place.

Structural inspection of a concrete building

Structural

The structural condition assessment your recertification requires, documented and signed by a licensed Florida professional engineer. For threshold buildings we offer a separate consultation on how the work is best structured.

Learn more →
Electrical inspection of building service equipment

Electrical

The complete electrical inspection your recertification requires, carried out and signed by our licensed professional engineers.

Learn more →
Infrared thermographic inspection in progress

Infrared thermography

Level II thermographic inspection carried out by our own certified thermographers, required where a building has electrical equipment rated 400 amps or larger. One team, one point of accountability.

Learn more →
Illuminated South Florida parking lot at night

Nighttime parking lot illumination

The nighttime lighting check required where a property has parking, carried out alongside the rest of the inspection so it never becomes a separate appointment to coordinate.

Learn more →

Every building is different. We confirm the exact scope that applies to your building before any work begins.

Has the City sent a notice on your building?

Send it to us today. We confirm the deadline, the scope and the timeline before anything is scheduled.

Know before you call

The questions every North Miami owner has

South Florida building requiring recertification

What recertification actually covers

When a building reaches its milestone age, the county requires a documented inspection of its key systems. Structural and electrical are the core. Infrared thermography is added where equipment is rated 400 amps or larger, and a nighttime lighting check is added where the property has parking. In North Miami the documentation is filed with the City's Building Department on the county's report forms. You finish with proof of recertification on file and a record you can give to a board, a lender or an insurer.

Recertification milestone timeline

When does your first recertification hit?

Condominium and cooperative buildings three stories or taller within three miles of the coast start at 25 years. Near Biscayne Bay many buildings fall under that rule, while the county's coastal map decides for each address further west. All other buildings start at 30, and both then repeat every 10 years. The number most people still use is 40 years, but that is the older name for what is now a 25 or 30 year milestone. If a notice has arrived, the clock is already running. The earlier the process begins, the more control you have over the timeline, the scope of any repairs and the outcome.

Engineer reviewing findings with a building owner

What happens if your building has deficiencies

This is the part most owners are quietly concerned about, and it is more manageable than it sounds. You receive a draft report and a conversation about what was found and what the options are, before anything is filed. Any repairs that are required go through proper permitting. You are never locked into a specific contractor. You choose who carries out the work, and we can work alongside whoever you appoint. Buildings with deficiencies are recertified every day. Finding something is not the end of the process, it is a step within it.

Free download

The recertification readiness guide

A two-page guide to what our team looks for at your property and how to prepare for inspection day. Nothing to fill out or return, we handle the evaluation. Tell us where to send it.

Email or phone required. Everything else is optional.

Recertification readiness guide
Next step

Tell us about your
North Miami building.

We will outline exactly what your recertification requires, what the scope covers and what it takes to file it with the City.